One measurable view of asset performance for owners and managers

Al-Mizan scores each asset from validated evidence against the owner's priorities, so accountability rests on shared numbers instead of competing reports.

Works alongside your existing portfolio systems, it does not replace them.

Shared performance view

Marina Residences, Tower A, October 2026

Demo data

68.6
out of 100

Standard EI

Priority-Adjusted View: 66.1

Performance Composite
81.0
Burden Composite
36.0

normalised scale

  • CFP
    80.0
  • KPI
    90.0
  • RS
    70.0
  • AM
    30.0
  • RCI
    40.0

Owners and managers, one set of numbers

Owner

See how an asset performs and why.

  • Portfolio priorities
  • Performance expectations
  • Capital priorities
  • Risk tolerance
  • Approval authority

Common performance view

  1. 01Validated evidence
  2. 02Efficiency Index
  3. 03Accountability and action
  4. 04Owner review and validation

A shared reference, not one-sided oversight.

Asset Manager

Show performance with the evidence behind it.

  • Operational execution
  • Asset KPIs
  • Resource utilisation
  • Corrective action
  • Performance delivery

Without a common framework

  • Each side keeps its own numbers.
  • Targets drift between reporting periods.
  • The methodology is disputed after the result.
  • Actions are agreed in meetings and not tracked.

With Al-Mizan

  • Same validated evidence
  • Same approved targets
  • Same methodology and result
  • Same action history

One Evidence Base. Two Performance Perspectives.

The Efficiency Index converts validated financial, operational and resource information into a reproducible asset-performance measure. Owner-defined priorities provide a separate strategic perspective without changing the standard result.

Standard Efficiency Index
Scored with the approved, version-controlled reference methodology. It is the same for every owner, so assets can be compared on equal terms.
Owner Priority-Adjusted View
The same validated evidence, re-weighted by a priority profile the owner approves. It changes strategic emphasis, not the underlying measured condition.

STANDARD EI

68.6

Comparable reference measure

PRIORITY-ADJUSTED VIEW

Priority profile
66.1

Difference from Standard EI: -2.5

Owner-defined emphasis

Priorities change emphasis, not the measured condition. Standard EI never changes.

Same underlying evidence · Different weighting perspective · Demo data

Performance Composite
81.0 normalised scale
Burden Composite
36.0 normalised scale
Period
October 2026

Performance drivers

higher is better
  • Cash Flow CFP80.0
    What this measures

    How well the asset turns its operations into cash that reaches the owner, compared with what was planned.

  • KPI Delivery KPI90.0
    What this measures

    How much of the agreed operating targets the asset delivered in the period, such as occupancy, service levels and maintenance goals.

  • Resource Strength RS70.0
    What this measures

    How well the asset's people, equipment and budget are placed to sustain its performance.

Performance burdens

lower is better
  • Amortisation Burden AM30.0
    What this measures

    How much of the asset's income is absorbed by repaying capital and financing costs. A lower burden is better.

  • Resource Consumption Intensity RCI40.0
    What this measures

    How much energy, water and other resources the asset uses for the output it delivers. Lower consumption is better.

Data Confidence — separate from EI

Evidence completeness, validation, timeliness, consistency and provenance are assessed apart from the score.

Validated evidence

Intelligence earns trust when evidence is verifiable and decisions are accountable.

Accountable Governance

Every material finding is connected to supporting evidence, responsible parties, and a traceable decision process. Management actions and their outcomes remain subject to authorised review and verification.

Data Confidence

Evidence reliability is assessed separately from asset performance. Only eligible, validated information supports authoritative Efficiency Index measurements, while missing or unverified inputs remain clearly identified.

Human-Governed AI

AI assists with document extraction, evidence analysis, and explanation of performance findings. Validators establish evidence eligibility, the deterministic engine calculates, and authorised owners retain decision authority.

How Al-Mizan works

Five stages. One continuous governance cycle.

AI-assisted stage. A person reviews and approves the result before it counts.

STAGE 01 / 05

Evidence prepared

Capture & Structure

User input · AI-assisted

Asset documents and operational data are ingested. AI extracts and organises candidate information with traceable source references.

AI-assisted

Start small. Establish what works.

Explore how Al-Mizan can connect trusted asset evidence, reproducible performance measurement, and accountable management actions through a controlled institutional pilot. The scope, permissions, methodology, and success criteria are agreed in advance, with institutional owners retaining decision authority.

  1. 01
    Define the Pilot ScopeAgree on a representative asset sample, institutional objectives, reporting periods, and measurable success criteria.
  2. 02
    Establish Governance ControlsDefine owner, manager, and validator responsibilities, evidence access, methodology, and approval requirements.
  3. 03
    Validate & MeasureReview and validate eligible asset evidence before calculating the Efficiency Index, with Data Confidence reported separately.
  4. 04
    Act, Verify & ReviewTrack authorised management actions, validate follow-up evidence, reassess performance, and review outcomes with institutional decision-makers.

Contact the team

From trusted evidence to accountable decisions. Write or call to arrange a walkthrough, discuss a pilot, or request a private preview.